香港修订法例打击滥用公屋行为 确保资源善用

“同运动·一家亲”:四川珙县体育搭台促民族团结

中国大型水陆两栖飞机AG600“鲲龙”获颁生产许可证

第五届中国(宁夏)国际葡萄酒文化旅游博览会开幕

2025年中国内地电影端午档票房较去年同期显著增长

四川夹江:赛龙舟抢鸭子迎端午

Beijing preps for full operation of new metro line

发布时间:   来源: chinadaily.com.cn

The northern section of the Beijing Metro Line 17 has started its debugging, and it is expected to go into no-load operation in the third quarter and become operational by the end of this year.

With a total length of 49.97 kilometers and 21 stations, Beijing Metro Line 17 is fully underground and runs through four districts: Dongcheng, Chaoyang, Changping and Tongzhou.

The southern section of Line 17 went into operation at the end of 2021. The northern section spans 26.3 kilometers and has 10 stations. With eight-car type A trainsets, maximum speed can reach 100 kilometers per hour.

As the new line goes into operation, it is expected to ease passenger traffic pressure from Lines 5 and 13, further improving rail transit service in the Future Science City area, Huilongguan and Tiantongyuan neighborhoods in Changping district.

This year, Beijing will continue construction on 11 rail transit lines with total length of 231.3 kilometers, said Yang Liming, director of the No 1 department of rail transit under the Beijing Major Projects Construction Headquarters Office.

As the northern section of Line 17 and the remainder of Line 16 go into operation, Beijing's metro network will exceed 837 kilometers in length by the end of this year.

上一篇:Japanese companies willing to expand in Chinese market
下一篇:PLA dismisses fears over Rocket Force capability

首页   |   

Copyright © http://www.yhkmac.com 粤港澳头条 版权所有