天涯共月,中希同辉|2026年“天涯共此时——中秋游园诗会”在希腊圆满举行

《和光同成》2026加拿大国际艺术邀请展盛大启幕

外媒聚焦:服贸会推动国际务实合作 世界共享中国市场机遇

杭州湘湖自由庄园丨艺术唤醒生命论坛暨操驰个人作品展启幕

澳琴国际教育(大学)城三高校联合举行开学礼

好一个江门,“武”动热血侠气

4,000-ton steel structure lends Guangzhou Baiyun Railway Station petal appeal

发布时间:   来源: Ecns.cn

(ECNS) -- A 4,000-ton steel structure of Guangzhou Baiyun Railway Station, a major transport hub for Greater Bay Area, has been completed, lending the station a flower-petal look.

The railway station was inspired by Kapok, the city flower of Guangzhou, Guangdong Province.

It will receive all conventional-speed trains of Guangzhou Railway Station and Guangzhou East Railway Station after completion.

The project is expected to be finished by the end of 2023.

上一篇:Chinese researcher-led project endorsed in UNESCO Ocean Decade Actions
下一篇:WorldSkills Shanghai 2022 canceled

首页   |   

Copyright © http://www.yhkmac.com 粤港澳头条 版权所有